City of Gresham Data Center (Gresham, OR)
The Genesis DCS System was installed atop the City of Gresham's data center in 2013. Time since install: 18 months Supply air temperature set-point: 72 degrees Maximum deviation from set point: (+/-) 2 degrees Downtime: None Repairs: $0 Maintenance Costs: $0 PUE: 1.05
|
|